Guide

How long does a kitchen remodel take?

The honest answer depends on how much you change. Here are the phases in order and the things that move the schedule.

How long does a kitchen remodel take? It depends on the scope more than anything else. A kitchen that keeps its layout and gets new cabinets, counters and tile moves quickly. A kitchen that moves the sink, opens a wall or adds circuits takes longer, because more trades are involved and each one has to finish before the next can start. We do not quote a number of weeks in a guide, because any number we printed would be wrong for most kitchens.

What sets the length of the job

Four things decide the schedule. The first is scope: how many trades touch the room. The second is lead time on materials, especially custom cabinets and countertops. The third is what is hiding behind the walls. The fourth is how fast you make decisions. You control the last one, and it slips more often than people expect.

The phases, in order

Kitchens go through the same sequence nearly every time. The order matters, because most of the work covers up the work before it.

  1. Planning and ordering. Layout, cabinet style, countertop material, appliances, tile and lighting are chosen and written into the scope. Long-lead items are ordered now, before demolition starts.
  2. Permits. If the work changes structure, plumbing or electrical, it usually needs a permit, and the application has to be approved before that work begins.
  3. Demolition and protection. Old cabinets, counters and flooring come out. Dust barriers and floor protection go in.
  4. Rough work. Framing changes, then rough plumbing and electrical, including new circuits and lighting boxes. Inspections happen here, before anything is closed up.
  5. Drywall and paint prep. Walls are closed, taped, textured and primed.
  6. Flooring and cabinets. Cabinets are set level and fastened, then trimmed out.
  7. Countertops. Templates are taken from the installed cabinets, then the tops are fabricated and set. This gap is the one homeowners notice most.
  8. Backsplash, plumbing and electrical finish. Tile, sink, faucet, fixtures, switches, outlets and lights.
  9. Paint, punch list and final inspection. Touch-ups, hardware, adjustments and a walk-through.

How long a kitchen remodel takes when the scope grows

Every added item stretches the job in a predictable way. Moving a sink means new drain and supply runs, which means opening the floor or wall and patching it afterward. Taking out a wall can bring in framing, a beam, and a new round of drywall. Adding lighting or circuits means wire pulled through finished ceilings. Our kitchen lighting guide covers what to settle before the electrician arrives, and our electrical work is handled by the same team that runs the project.

Appliance changes do the same thing quietly. A larger range or a new vent hood can need gas, power or ducting that the old kitchen never had.

Where kitchens fall behind

  • Cabinets or counters ordered late, or ordered before the final measurements were confirmed
  • Appliances changed after cabinets were built to fit the old ones
  • Hidden damage, old wiring or plumbing that does not match the plans
  • Permit or inspection holds, because rough work cannot be covered until it passes
  • Slow decisions on tile, fixtures or paint, which stall the trades behind them
  • Changes made verbally and never priced, then argued about at the end

Permits and inspections take calendar time

Permit review does not run on the contractor's clock. In Brentwood, permits go through the Development Services Division, and applications are submitted electronically through the city's portal. Other towns we serve run their own offices with their own methods, and some do not issue permits over the counter. We ask each office what applies to your job and tell you what to expect. For details on your town, see our service areas.

How to keep the schedule honest

Get the scope in writing before work starts. California law requires a written home improvement contract above a small threshold, and CSLB advises that the contract state when work begins and ends and that changes be written as change orders. A date range in the contract is a commitment to talk about, not a promise that nothing will move.

Then protect the schedule yourself. Choose tile, fixtures and paint before demolition. Confirm appliance models before cabinets are built. Answer questions the same day when you can. If you are still weighing choices, our guide to choosing kitchen cabinets and countertops helps you settle the two items that control the pace.

Living through it

Plan for a long stretch without a usable kitchen. Move a refrigerator, a microwave and a hot plate to another room, use paper plates, and expect dust despite the barriers. If you are also thinking about a bathroom, doing both at once can save mobilization, and our kitchen and bathroom remodeling page explains how we run combined jobs. For the budget side of the same decision, read how to budget for a kitchen remodel.

N. Abeyta Remodels is a licensed and insured remodeler based in Brentwood, and one team manages the whole project. See the full kitchen remodeling service for what we handle.

Kitchen remodel timeline: questions

How long does a kitchen remodel take?

It depends on the scope. A swap of cabinets and counters in the same layout moves faster than a job that relocates plumbing, changes walls or reworks the electrical. Any honest answer has to start with a walk through your kitchen, which is what a free estimate is for.

What is the biggest cause of delays?

Materials that arrive late or arrive wrong, and surprises found when walls and floors are opened. Custom cabinets and countertops are made to order, so they set the pace more than any other item.

Can I live in the house during a kitchen remodel?

Most people do. Plan for a stretch with no working sink or range, and set up a small temporary kitchen in another room. We tell you ahead of time when water, gas or power will be off.

Why does the schedule change after work starts?

Opening walls can reveal old wiring, plumbing or damage that has to be fixed first. We write these down as change orders so you see what changed and why before work continues.

When should I order cabinets and countertops?

Early. Order cabinets once the layout and scope are settled, and schedule the countertop measurement only after the cabinets are in. Delays in these two items are the most common reason a kitchen sits unfinished.